Upgrade energy efficiency, security, and curb appeal with commercial‑grade windows, entry doors, and aluminum storefront systems. TORCH delivers clean, code‑compliant installs with proper flashing, air/water integration, and hardware tuned to your traffic and safety needs.
What we install & upgrade
- Aluminum storefront systems (framing, glazing, transoms, sidelites)
- Commercial entry doors (aluminum, steel, fiberglass), vestibules, and revolving door prep
- Insulated glass units (IGUs), tempered/laminated safety glazing, Low‑E options
- Panic hardware, closers, continuous hinges, thresholds, ADA operators
- Sealants, flashing, sill pans, and tie‑ins to WRB/air barrier
System options (performance & aesthetics)
- Energy performance: thermally broken frames, IGUs, Low‑E/argon, thermal spacers
- Security & safety: laminated glass, reinforced frames, panic bars, card access prep
- Accessibility: ADA‑compliant openings, lever hardware, low thresholds, automatic operators
- Brand presence: custom anodized/paint finishes, narrow‑to‑wide stiles, applied logos/graphics
Envelope details we get right
- Sill pans and end dams at door/window openings
- Head/sill flashing integrated with WRB/AB
- Backer rod + sealant joints at frames and dissimilar materials
- Continuous shims/packers for plumb, level, square installs
- Weeps and drainage paths preserved (no blocked cavities)
Our process
- Assessment & measure – Site review, rough openings, traffic patterns, hardware schedule
- Spec & proposal – Frame/glass/hardware selections, finish, performance targets, lead times
- Permits & ordering – Submittals, shop drawings, and coordination with other trades
- Prep & protection – Temp protection, demo, verify substrates and plumb/level conditions
- Install – Frames set, flashed, and sealed; hardware hung and adjusted; glazing set per spec
- QA & turnover – Operation checks, weatherseal review, touch‑ups, documentation, and warranty
Why TORCH
- Code‑compliant openings with ADA and life‑safety hardware
- Proper flashing and water‑management for long‑term performance
- Organized scheduling to minimize downtime for tenants and staff
- Fully insured; COIs and submittal packages available on request